New Meadowlands Stadium

Contracting Agent: Skanska USA

Project Location: East Rutherford, New Jersey

Project Highlights: Construction of Phase 4, 6, 8 and 9 Roadways and Parking Lots including: Demolition of the NY Giants Training Bubble, 75-Ton Concrete Filled Steel Shaft Piles for High Mast Light Foundations, Reinforced Concrete Pile Caps, Mass Excavation, Grading, High Voltage Electrical Duct Banks, High-Mass Parking Lot Light Fixtures, Roadway Lighting Fixtures, Concrete Curbs, Concrete Sidewalks and Asphalt Paving.

Reconstruction of Interchange 16W Entrance and RT 120 Entrance including: Excavation, Storm Drainage, Signalized Traffic Lights, Roadway Lighting, Concrete Curbs, Concrete Sidewalks  and Asphalt Paving.

Construction of Perimeter Stadium Plaza Area including: 75 & 150 Ton Concrete Filled Steel Shaft Piles for Lighting, Ticket Booths and Gates, Reinforced Concrete Pile Caps and Grade Beams for Lighting , Ticket Booths and Gates, High Voltage Electrical Duct Banks and Plaza Lighting Fixtures.

 